Talking about the preparatory work before installation of multi-pole type trolley wire:
1, according to the terrain and factory requirements drawing installation diagram. No special circumstances can be prepared as shown below.
2. Bracket assembly. The length of each linear pipe is 4m. The span of the bracket is 1.2m or 1.5m. It can also be increased or decreased according to the site conditions. The bracket must be firm and neatly arranged.
3, installation inspection
a. Conductors should pass freely through the catheter.
b. The brush in the conductive device should be flexible and flexible, and it must be flexible and flexible.
c. Check whether there is any crack or distortion outside the catheter, and whether the guide rail joint inside the catheter is straight and smooth.
For more questions about multi-pole tube type installation, please contact us.