I. Overview The Zizi Zirconium Mine is located in Lufeng County, Guangdong Province, China. It is a coastal sand deposit with zircon. The resources of the mining area were discovered in 1957, and the mine was started in 1958. It was put into operation that year. From 1958 to 1901, Zhang relied on the soil method for production. The rough selection was carried out by using triangular troughs, tire spiral concentrators , soil shakers, etc. There were only two single-disc magnetic separators and several upper shakers. From the end of 1061 to the end of 1965, it was discontinued for some reason. In early 1966, production resumed. From 1967, it began to use water gun mining, sand pump transportation, Guangdong type I jig and shaker for rough selection, and the selection plant also added electrification. Machines, magnetic separators and other equipment began to enter the mechanized production stage. Due to the Guangdong Type I jig, the ore sorting effect of this mine is not good enough. In 1974, the tire spiral concentrator was used as the roughing equipment. In order to further improve the rough selection effect, the tire spiral concentrator was replaced by a plastic spiral chute in 1978. Over the years, while the process and equipment of the mining plant have been continuously improved and improved, the technological level of the selected plants has also been improved accordingly. Up to now, the selected plants have formed a joint process of re-election, magnetic separation, electro-election and flotation, which has improved the technical and economic indicators and comprehensive recovery capacity of the selected plants, except for the main product zircon. outer stone, iron ore can be integrated recovery of titanium, rutile, monazite, cassiterite and other by-products.
2. Geological Profile of Mineral Deposits and Ore Properties The Zizi Zirconium Deposit is a coastal sand deposit sand mine. The ore body runs along the east-west direction of Jiazi Bay, and is basically parallel with the coastline. The average length is 5,500 meters, the average width is 870 meters, and the average thickness is 3.64 meters. The ore body accounts for 91.8% of the reserves. The ore particle size is relatively uniform and the mud content is less. The mining conditions are good. The main minerals of the mine are zircon, followed by ilmenite. Other minerals that can be comprehensively recovered include leucite, rutile, cassiterite, anatase and monazite. Other metal minerals are: magnetite, titanomagnetite, hematite, limonite, pyrite, etc., due to the low content, no recovery value. Gangue minerals dominated by quartz, the content of more than 95% of the total amount of minerals, other gangue minerals: epidote, garnet, tourmaline, feldspar, chlorite, mica, apatite and the like. Most of the minerals in the ore are present as monomers, and the useful minerals are finer in size, zircon and anatase. The rutile is enriched in the 0.125-0.063 mm particle size, while the ilmenite is enriched in the 0.25-0.063 mm grain size. Relatively speaking, the ilmenite grain size is relatively coarse. The ore density is 2.66 tons of glutinous rice 3 and the loose density is 1.534 tons/meter 3. The relative content of ore minerals in the ore, a number of analyses, the main mineral pure mineral analysis and screening analysis are shown in Table 1, Table 2, Table 3 and Table 4, respectively. Table 1 Various mineral contents in ore

name Ilmenite Titanite Anatase Rutile Zircon Monazite magnetite Hematite
content,% 1.7949 0.3032 0.0089 0.0621 0.5930 0.0604 0.0759 0.0311
name Limonite tourmaline topaz Emerald stone quartz other
content,% 0.0121 0.1219 0.0778 0.0118 98.8386 0.0212

Table 2 Results of multiple analysis of ore

ingredient TiO 2 ZrO 2 SiO 2 P Sn Fe 2 O 3 Al 2 O 3 CaO
content,% 1.20 0.5 91.60 0.017 0.0038 2.95 2.22 0.26
ingredient MgO Nb 2 O 5 ThO 2 S total
content,% 0.02 0.0067 0.001 0.008 98.3365

Table 3 Analysis results of several single minerals

name TiO 2 ZrO 2 Nb 2 O 5 Ta 2 O 3 FeO Remarks
Ilmenite 52.86 0.195 0.135 0.04 40.38 -
Titanite 73.89 - 0.36 0.076 - -
Zircon 0.15 66.64 - - - Within HfO 2 1.15

Table 4 Raw ore screening results

Screen grade, mm Yield,% grade,% Occupancy, %
TiO 2 ZrO 2 TiO 2 ZrO 2
5.0~0.32 26.64 0.13 0.05 2.79 2.83
0.32~0.20 17.50 0.82 0.06 4.51 2.23
0.20~0.16 25.09 0.50 0.09 10.00 4.80
0.16~0.10 20.69 1.66 0.39 27.65 17.16
0.10 to 0.06 3.65 15.04 7.29 44.19 56.57
-0.06 6.43 2.08 1.20 10.77 16.47
total 100.00 1.242 0.47 100 100.00

Third, the production process and technical indicators (a) mining and selection plant Jiazi Zirconium mining and dressing plant is currently using the water-water transport, spiral chute selection process. It adopts φ15.24 cm (φ6 inch) imitation flat-type water to grab mining, the pump is 10sh-9 type, and the motor power is 55 kW. The slurry is conveyed by a φ20.32 (φ8 inch) sand pump pipe. The stope is 600 meters long and 300 meters wide. The slope of the floor is 10%. The sand pump is 100 meters away from the working face. The concentration of raw ore can reach 16%-20%. The raw ore slurry is firstly screened to pre-screen and remove foreign matter such as coarse sand, shells and weeds. The sieved product is classified into a spiral chute for rough selection and the tailings are discarded. The coarsely-selected concentrate is then selected by a spiral chute to obtain concentrate for the selected plant, and the selected tailings are returned to the rough-selected ore for re-election. The principle of mineral processing principle of the Zirconium Ore Mine Roughing Plant is shown in Figure 1. The technical and economic indicators for rough selection in the past three years are shown in Table 5.

1.jpg

Figure 1 Zirconium ore fine selection process Table 5 Zirconium ore technical indicators

year grade,% Recovery rate,%
Raw ore Group concentrate
ZrO 2 TiO 2 ZrO 2 TiO 2 ZrO 2 TiO 2
1982 0.356 0.928 9.92 31.52 57.68 48.05
1983 0.200 0.601 8.22 18.42 47.49 36.35
1984 0.349 0.840 8.85 20.76 57.21 55.94

Electricity consumption of mining and dressing plant: 3.9 ~ 4.6 kW · hr / ton · raw ore (2) After the coarse ore concentrate of the selected plant is firstly re-elected by shaker, the low-density gangue is further discarded, and the concentrate is divided into monazite-rich, The cassiterite and two products rich in ilmenite, zircon and rutile are separately selected by re-election, electro-election, magnetic separation, and reverse flotation, to obtain monazite, cassiterite and ilmenite, zircon Concentrates such as rutile. The process flow of the Zirconium ore selection process is shown in Figure 2, and the technical indicators are shown in Table 6. Figure 2 Zirconium ore selection process flow table Table 6 Zirconium ore selection plant technical indicator table

year Zircon Ilmenite Rutile Monazite grade
grade Recovery rate grade Recovery rate grade
ZrO 2 % % TiO 2 % % TiO 2 % xT 2 O 3 +ThO 2 %
1982 61.95 85.47 49.82 66.34 85.37 55.00
1983 61.70 83.45 49.39 65.59 85.01 60.06
1984 61.81 83.07 48.76 62.52 85.00 57.85